Pyrolysis Unit

Pyrolysis Unit

Project code:

d0l5vmrp1lrp4yzw

Type:

Other

Postcode:

CW3 9QY

Local authority:

Shropshire

Stage of development:

Design, Planning & Feasibility

Funding required:

£1,566,160

Funding complete:

0%

Status:

Validated

Cost per tonne of CO2e saved:

£319

Benefits beyond carbon saving:

Improved Biodiversity,

This project is to invest in a pyrolysis unit at a planned net zero highways depot in Shropshire. The unit would be used to produce biochar from biomass which will result in less biomass decomposition (which release emissions into the atmosphere) whilst the biochar itself will become an excellent long-term store for carbon. The project plans to use diseases ash trees that will require felling anyway as the biomass feedstock to produce the biochar. *This project location is chosen randomly within the county*